Roadworks and traffic interruptions alert from One.network
Traffic restrictions and roadworks starting within the next week, displaying 2 traffic restrictions and 9 roadworks
TRAFFIC INTERRUPTIONS
Ampthill Road, Silsoe
13 August – 14 August
Delays likely – Road closure
Name: Ampthill Road, Silsoe
Location: Ampthill Road
Description: Streetworks / License – Streetworks
Responsibility for event: Central Bedfordshire Council
Current status: Planned
Ampthill Road, Silsoe
13 August – 14 August
Delays likely – Diversion route
Name: Diversion
Location: Ampthill Road
Description: Streetworks / License – Streetworks
Responsibility for event: Central Bedfordshire Council
Current status: Planned
ROADWORKS
Ampthill Road, Flitwick
14 August — 15 August
Delays likely – Traffic control (give & take)
Works description: Install new Kee Klamp railings on the mud to stop people from potentially falling down the slope
Works location: Opposite 30.
Responsibility for works: Central Bedfordshire Council
Current status: Planned work about to start
Works reference: UC02000237835
Ampthill Road, Maulden (Flitton Hill)
16 August — 10 September
Delays likely – Road closure
Works description: Installation of a structural liner within the existing culvert and gabion baskets on the river bed either end of the culvert, 24-hour closure
Works location: C140 Ampthill Road, Maulden, MK45 2BE. From jct at A507 up to but not inc jct with Flitton Hill (technically it’s Maulden, but it’s the turning off the bypass, adjoining Flitton Hill)
Responsibility for works: Central Bedfordshire Council
Current status: Planned work about to start
Works reference: UC020C-21_22-234637
Flitton Hill, Flitton
11 August — 11 August
Delays likely – Road closure
Works description: new water supply connection
Works location: The Swallows
Public-facing description: One.network has automatically assigned a category of New Connection to this Works based on the information available. Please note: Works Descriptions are not published by Anglian Water.
Responsibility for works: Anglian Water
Current status: Advanced planning
Works reference: AD02910643880_2
Station Square, Flitwick
15 August — 16 August
Delays likely – Traffic control (two-way signals)
Works description: Section 81
Works location: Opp post office
Public-facing description: One.network has automatically assigned a category of Unclassified to this Works based on the information available. Please note: Works Descriptions are not published by Anglian Water.
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD03359058993
The Green, Clophill
17 August — 19 August
Delays likely – Traffic control (multi-way signals)
Works description: new water supply connection
Works location: near 15a
Public-facing description: One.network has automatically assigned a category of New Connection to this Works based on the information available. Please note: Works Descriptions are not published by Anglian Water.
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD02910633400
Steppingley Road, Flitwick
17 August — 23 August
Delays possible – Traffic control (two-way signals)
Description: Cadent has not assigned a specific description to this Works. Please note: Works Descriptions are not published by Cadent.
Responsibility for works: Cadent
Current status: Planned work about to start
Works reference: AZ7011001080430
Chandos Road, Ampthill
13 August — 17 August
Delays unlikely – No carriageway incursion
Description: One.network has automatically assigned a category of New Connection to this Works based on the information available. Please note: Works Descriptions are not published by UK Power Networks.
Responsibility for works: UK Power Networks
Current status: Planned work about to start
Works reference: EC30039051368
Moores Close, Maulden
13 August — 19 August
Delays unlikely – No carriageway incursion
Description: One.network has automatically assigned a category of New Connection to this Works based on the information available. Please note: Works Descriptions are not published by UK Power Networks.
Responsibility for works: UK Power Networks
Current status: Planned work about to start
Works reference: EC30078348789
The Thinnings, Flitwick
11 August — 13 August
Delays unlikely – No carriageway incursion
Works description: Excavate to raise concrete surround at atplas, level tarmac
Works location: 2
Public-facing description: One.network has automatically assigned a category of Unclassified to this Works based on the information available. Please note: Works Descriptions are not published by Anglian Water.
Responsibility for works: Anglian Water
Current status: Planned work about to start
Works reference: AD03259326208